Showing posts with label Frame Welding. Show all posts
Showing posts with label Frame Welding. Show all posts

Monday, March 23, 2009

The axle is here!

The new Dexter Torflex axle has arrived. Much research and deliberation went into the selection and ordering of this. I looked into buying a similar axle from two well known Airstream people. Wanting to support the A/S trailer community was the goal, but I ended up supporting my local Dexter distributor instead.

Six Robblees is the Dexter shop in town and I really like being able to walk into the store and talk to two or three sales people face to face. They really know their stuff and order these things every day. They even hid their eyes as I'm sure they rolled them many times as I asked the most obscure questions that I'm sure didn't really matter. A little silly, but I even called and talked to a Dexter engineer about a few of the questions I had about frame stiffening and exactly how to size the axle to fit this old trailer. I'd be happy to go into painstaking detail if you'd like to be put to sleep (I tried it out on Katie -- she couldn't take more than a few minutes...).

One of the big factors in deciding where to place my order (and spend my money) was shipping charges. I could get the axle shipped common carrier for about $300 in freight, and get it in two to three weeks. Or I could have it attached to a Six Robblees weekly order shipped by train and get it in four. We decided on the train, since there would not be an additional freight charge. A roll of the dice, considering I wanted to get the steel work done, welder put away and frame turned camping side up.

Three weeks to the day after ordering, they called asking me to come get the axle. I borrowed a work van to go get it.





I had weighed the old axle and springs. They weighed in at 243lb. The new setup is right at 240lb. Travis is the guy who placed the order (looks like Traw's in the photo).




Twisted Fred's arm to help me after work a few days later to get it moved onto the frame and measured into place. We bolted the brackets that weld to the frame to the axle.




Following Dexter's instructions, we found the center line of the frame. We snapped a line and clamped a straight edge on the chalk marks. Fred and I were totally amazed that this fifty year old frame was about as straight and true as we could measure. What a relief, it made the job of squaring the axle very easy.




Getting very close to tacking the brackets in place.



We squared the axle to the center line and centered the brackets laterally to the frame. A final check was to measure from the ball to the face edge of left and right brackets. I have a laser measuring device I use for work that I used to take the measurements -- the distance was the same. Totally amazing.



Got the nod from my Technical Adviser (Fred), so I went to work tacking the plates to the trailer.




After getting the plates fully tacked in place, we took the axle off and put it into storage so I could finish the welds.



'Give 'em the whole nine yards' kept looping through my head as I bounced around inch by inch on the brackets. Yards of wire fed through the mig welder to connect the plates.





I do not usually do this much welding. I hope my buddy Hugh approves of my work, he's MUCH more accomplished and technically trained than me. Did I mention I learned to weld at art school?







Monday, March 2, 2009

Frame work, weekend II

Lucky for me, I had a big helper on Saturday. His work is good and he works for donuts and chocolate milk (Starbucks across the street!)




Three big projects to finish up this weekend: holding tanks, fix the step and build a spare tire holder. Three things don't sound like a lot, but they require brain power in a field that I don't usually work and my helper doesn't like loud noises (but does like sparks.)

First thing to do is get the workshop set up. I do all this Airstream restoration in the loading bay at my work. I try to tuck tools and supplies away at the end of the weekend. During the week there isn't much time to work on the trailer anyway, mostly planning materials and rationing time out for weekend projects.

The holding tanks came on Friday afternoon. Getting them here proved to be a big challenge. I wanted to get two really durable tanks made in a rotomold process. There are hundreds if not thousands of tanks to choose from. There are nearly as many manufacturers to choose from as there are tank stiles. Since there are so many tank shapes, the manufacturers only make them when they are ordered. The hardest part for me was getting two tanks to fit our needs in a week or less. I had hoped I could rely on the resources of a local RV shop to help me select and rush them here, but it ended up not working out that way. All their suppliers take seven days to produce the tanks plus four to seven more days for shipping.

I found a manufacturer in California who will charge a rush fee of $20 per tank to make them the next day. Their customer service rep took my order immediately upon calling them and did me a favor by getting them made during the current days run. That was Monday morning, the tanks on their way to me Tuesday by UPS. Friday afternoon, I had a couple of tanks begging to be put to work.

Emmett and I placed the tanks in their approximate position on the frame. Since the frame is upside down right now, we could lay them there and talk over the plan of how to attach them. We made material lists for the tank mounts, step reinforcement and spare tire carrier. Off to the steel yard!

By the time we got back with steel, the supervisor and his guard dog had arrived for lunch.




Keeping my baby warm...




The big challenge for me with the holding tanks is to not overdo the mounts. I want to hold the tanks well. If full, the gray tank will hold up to 32 gallons and the black tank will hold 18 gallons. 50 total gallons of waste water weighs about 400 pounds. We don't need either tank coming loose on the road or damaging the frame or anything else.

I had gotten some advice on the Airstream Forums on what to do. Air forums allows you to search past threads to read what had been done before and writing to people who are doing the same thing I am doing now. That really helps me clear up questions of my design and decide what to do on the weekend.



I ended up reinforcing the existing cross members with 1" x 1" x 1/8" angle iron wherever I could. I decided to fabricate one using all new angle iron. It is heavier than the originals, but adds strength behind the axle and is plenty for the big holding tank.



Both tanks will be blocked down from the bottom of the plywood. The black tank will have 1 1/2" spacers screwed to the plywood. The gray tank will be blocked down 1 1/2" or 2". Not sure on that one yet. I'll wait to fabricate the steel straps that will hold them to the bottom of the trailer until next weekend. After the axle brackets are mounted (later this week I hope) and frame is painted (Friday night?), we'll flip the frame over for the last time and mount the plywood subfloor. Then the blocking can happen and tanks strapped in place.

Last thing to do on Saturday is to finish mounting frame members near the tongue to allow for a spare tire. I'm not crazy about having the spare tire under the front of the trailer, just because of how far down it hangs down. But we need the weight up there to help balance the tanks. Plus, it's gotta go somewhere.






Sunday morning I got to work on the spare tire carrier. I like the one I made for the old trailer. I modeled it after the kind Airstream has been making since the 1970's. It's really similar to the ones on new Airstreams too. Ran out of time on Sunday, so I finished it on Monday evening.












The step was fairly straight forward. The day we bought the trailer, the step was frozen in the open position. The pivot on the tire side was frozen, but the other one was fine. I had to use a loose tongue jack as a makeshift hammer to beat it closed. The more we looked at the step after sandblasting, the more it looked as though someone had left it open and driven it into something. It must have happened a long time ago, because it bent enough of the step that it must have been grinding pretty badly. That torque took its toll through the years. A bunch of metal had worn away. The loose pivot had mushroomed out enough that we decided to replace it. I helps to have a friend look a problem to give suggestions. The original pivot point is some kind of riveted assembly. I didn't want to cut it apart and replace it. But talking to Fred about it, replacement was inevitable.

Before:







After:







Much smoother operation. By welding washer and locknut to the outside of each side of the frame, the step can be removable (not that I ever want to take it out). Hopefully, the 3/8" cap bolt I am using as the pivot won't cause problems later on. Also added a piece of angle to stiffen the floor at the front step. I want the first step you take in the trailer to feel really solid. Forever.

Thursday, February 26, 2009

Get your weld on.

This weekend was dedicated to the frame. Looking at the before and after of two and a half long days, doesn't look that impressive. We did a on of work, but it doesn't look much different than when we started. Ted, my father-in-law came to help. HUGE HELP! He cuts, grinds, marks, helps set up, tickles the grandkids, drinks coffee and has a big smile the whole time! Carol came too to help with the grand kids. Always great having them up.

Friday night started out with some planning. Also some cutting and grinding on the front end. I had assembled some parts over the week. Sometimes I think ordering and collecting supplies during the week is harder than the work on the weekend. Planning and calling around during work breaks and lunch hours can be a chore. For this weekend, I needed new steel pieces from the sheet metal shop, angle iron for the stabilizer jacks, new tongue jack with backing plate, safety chains with the weld on bits for frame attachment, flat bar to reinforce for the new axle and parts to make a spare tire carrier. Along with getting all the welding supplies from home and setting up the 'metal shop' I was tired before we started!




Saturday morning, Ted started cutting four rusty outriggers off with the angle grinder. I started out working on the tongue. Drilled holes for the new jack and got it mounted up. Next, welded on its new base plate on the bottom side of the frame. Safety chains went on next. I'll grind the old bolt studs off and detail it out later. Tongue is almost ready for paint!




neat... sparks.... Emmett never gets tired of watching them.




Next, I turned to getting mounts welded on for stabilizer jacks. I had a pair left over from the old trailer. I mounted the rear pair to the 18 footer, but never finished mounting the front ones. I used them to make mounts on the frame. Both front and back are ready to be covered up. It's hard to see from this picture, but we plan on running the propane line between the jack ends. There is about an inch between the jacks to run a jacketed 1/2" copper line.





Ted cut out a few of the center steel supports so we could weld in frame stiffeners. 1/4" x 4" steel was added to the frame to make a box section centered on the old spring mounts. My technical adviser Hugh convinced me to make sort of a fish mouth on both ends of the stiffener to encourage frame flex at the ends of the added steel. "It works on racecars," he said. Good enough for me! Even my Jr. welder Emmett approved the design.




'Bout time to get things wrapped up, it's Sunday morning and we're all getting a little tired.




Leon is in his car seat taking lessons on how to drive a floor jack from Big Brother Emmett.



Georgia turned thirteen this month! She didn't want a cake, she wanted something else to nibble on. "Mmm. Smells like big boy!"



"MMMmmm! Tastes like a big boy!! This is the best Birthday present ever!"